krz/moonrise

Night-sky companion for iPhone, Apple Watch and Vision Pro: what's up tonight, the Moon, planets, launches and missions, and a Library of the solar system. SwiftUI app with a Cloudflare Workers backend. astronomy cloudflare-workers ios night-sky space swiftui visionos watchos

Commit 0b974e0e15

0b974e0e1521edb257a4524bba077e333a792815

parent: ae13fc05cd

Unsigned

cmc <hello@cleberg.net> · 2026-10-20 23:54 UTC

PLAN: decisions and before-publishing list (!71)

Records the eclipse countdown decision (foreground, English), the shipped launch push, WeatherKit and test-aid work, and a before-publishing list: LL2 key, Astronomical League and Lunar 100 decision, safety wording review, privacy label, WeatherKit and launch push setup, device checks.

Layout: unified · split

PLAN.org +30 −8
@@ -433,8 +433,9 @@ Sky, System, Sun, Launches, Library core (above).
433- Eclipse day for 2 August 2027. Done: IERS ΔT, contacts to 0.1 s, site 433- Eclipse day for 2 August 2027. Done: IERS ΔT, contacts to 0.1 s, site
434 time zone, precise location; cue script with safety rules, foreground 434 time zone, precise location; cue script with safety rules, foreground
435 spoken countdown, rehearsal, sun diagram, contact-time Live Activity. 435 spoken countdown, rehearsal, sun diagram, contact-time Live Activity.
436 Not done: background audio (App Review risk), Watch haptics, drive to 436 Decided: the countdown stays in the foreground (no background audio
437 totality, cloud climatology, field test on 6 February 2027. 437 mode) and in English. Not done: Watch haptics, drive to totality, cloud
438 climatology, field test on 6 February 2027.
438- Siri, Shortcuts and Spotlight. Done: 9 App Shortcuts over a MoonriseKit 439- Siri, Shortcuts and Spotlight. Done: 9 App Shortcuts over a MoonriseKit
439 =Answers= target; all Library pages in Spotlight; open page and show in 440 =Answers= target; all Library pages in Spotlight; open page and show in
440 sky. Not done: widgets and controls from the same intents, App Group, 441 sky. Not done: widgets and controls from the same intents, App Group,
@@ -451,13 +452,16 @@ Sky, System, Sun, Launches, Library core (above).
451 =0004_launch_designator.sql= on the remote D1 before deploying the Worker. 452 =0004_launch_designator.sql= on the remote D1 before deploying the Worker.
452 Not done: seeing the ascent (needs a trajectory model). 453 Not done: seeing the ascent (needs a trajectory model).
453- Live Activities. Done: satellite pass activity; small, limited-width and 454- Live Activities. Done: satellite pass activity; small, limited-width and
454 StandBy layouts for all activities; scheduled launch start at T−60 min. 455 StandBy layouts for all activities; scheduled launch start at T−60 min;
455 Not done: push updates (broadcast channels; channel API from a Worker 456 launch updates pushed over APNs broadcast channels, one per launch, with a
456 untested), storms, meteor peaks. 457 focused LL2 poll every 5 min from T−60 to T+15 (at most 13 anonymous
458 requests an hour); previews and DEBUG sample activities for testing. Not
459 done: storms, meteor peaks.
457- Observing conditions. Done: dark window and Moon times in the Today 460- Observing conditions. Done: dark window and Moon times in the Today
458 sheet, Moon notes on meteor peaks, passes and tours. Not done: WeatherKit 461 sheet, Moon notes on meteor peaks, passes and tours; opt-in WeatherKit
459 cloud (portal capability, opt-in decision, privacy text), light pollution 462 cloud (off by default, location rounded to 0.1°, sent only to Apple) with
460 (licence), meteor radiant altitude. 463 a go/marginal/no rating for tonight, passes and events. Not done: light
464 pollution (licence), meteor radiant altitude.
461- Observing programs. Done: =:CATALOG:= and =:UTC_OFFSET:= in the log, 465- Observing programs. Done: =:CATALOG:= and =:UTC_OFFSET:= in the log,
462 catalogue name matching, Messier progress, user program lists as Org 466 catalogue name matching, Messier progress, user program lists as Org
463 files, "not yet logged, up tonight". Not done: Astronomical League and 467 files, "not yet logged, up tonight". Not done: Astronomical League and
@@ -465,6 +469,24 @@ Sky, System, Sun, Launches, Library core (above).
465- AR camera overlay: later. First measure draw time and pointing on a 469- AR camera overlay: later. First measure draw time and pointing on a
466 device and add one-object alignment with a gyroscope heading. 470 device and add one-object alignment with a gyroscope heading.
467 471
472* before publishing
473- Launch Library 2 API key as the =LL2_API_KEY= secret. Anonymous calls from
474 Workers' shared IPs get HTTP 429 for hours at a time.
475- Decide on the Astronomical League lists (Herschel 400, Double Star, Lunar,
476 Binocular Messier) and Lunar 100 (Charles Wood, Sky & Telescope): ask for
477 permission or leave them to user program files.
478- Review of the eclipse safety wording outside engineering.
479- App Store Connect privacy label: Location, Coarse Location, App
480 Functionality, not linked, not used for tracking (WeatherKit).
481- WeatherKit: check a real forecast on a signed device build.
482- Launch push: Broadcast capability for =sh.krz.moonrise=; run the channel
483 trial in =spikes/apns-channels/README.org=; then either set
484 =APNS_MANAGE_CHANNELS= or fill the pool with =server/scripts/channels.ts=;
485 apply =0005_launch_channels.sql= on the remote D1 before deploying.
486- Device checks: Siri phrases, Live Activity layouts (Lock Screen, Dynamic
487 Island, Watch, CarPlay, StandBy), eclipse rehearsal with the silent
488 switch on, sky draw time and pointing.
489
468* risks 490* risks
469- Library scope: 320 pages is most of the effort. Ship 1.0 with fewer 491- Library scope: 320 pages is most of the effort. Ship 1.0 with fewer
470 pages before adding more. 492 pages before adding more.