Move the live suite's fixtures off krz/gitbay-ios !116

merged merged by cmc on 2026-09-20 01:33 UTC · krz/gitbay-ios:smoke-fixtures-off-app-repo into main

Discussion

cmc

The issue and merge-request fixtures move to ios-smoke/ui-smoke-edit, the repo the edit flow already commits to. krz/gitbay-ios stops accumulating smoke issues and closed merge requests and no longer needs a ui-smoke branch.

smoke-account.sh seeds ui-smoke divergent from main in the fixture repo — the MR flows open one merge request each way, so each side needs a commit the other lacks — and reruns now reach that step on an existing repo. The milestone the issue flow assigns is created by the suite.

Closes #9