Planning Cleanup Implementation Plan

For agentic workers: REQUIRED SUB-SKILL: Use superpowers:subagent-driven-development (recommended) or superpowers:executing-plans to implement this plan task-by-task. Steps use checkbox (- [ ]) syntax for tracking.

Goal: docs/plans, docs/design.md and docs/review-2026-10-05.md say what is done and what is not, and every open piece of work has exactly one home.

Architecture: Plans are historical once their commits land: their boxes get ticked against git log, and any step that did not ship is marked so in place. The design doc's status paragraph and phase-1 boxes are brought to today. The review is kept as a record with a note at the top that its tiers shipped and that the manual's "Known differences from Emacs Org" is now the living list. Open work goes to gitbay issues on krz/orgstar, one per piece, so the backlog is the issue list and nothing else.

Tech Stack: git log, gitbay issue create.

Spec: this file.

Global constraints

  • Plans are not rewritten or trimmed; only checkboxes and short "did not ship:" lines change.
  • A box is ticked only when the commit it names, or one that plainly covers the step, is found; a box for a verification step (a gate run, a VoiceOver pass) is ticked only when the result is recorded somewhere.
  • No new planning documents beyond this one.

Review focus

  • The two owed items in docs/design.md (the VoiceOver check at line 353, the M1 Air gate run at line 359) must remain unticked and get an issue each; ticking them by momentum is the failure to avoid.
  • Plan steps that say "Commit "X"" should be matched by subject, not by topic: git log --oneline --fixed-strings --grep="X".
  • The review's defects table was fixed by named commits (Fix duplicate bindings, Keep body folds through edits, Watch folders added during a session, Report each buffer's changes as its own, Refile and archive into open buffers, Babel: show errors, cancel runs, Line index, and cheaper block bands while typing, Open .org files from Finder, app icon, current docs); the clock report reading from disk (ClockViews.swift) is the one row to check by reading the code before calling the table closed.

Task 1: Tick the 20 plans

Files: the plans with open boxes, found with for f in docs/plans/*.md; do grep -q '^\s*- \[ \]' "$f" && echo "$f"; done (20 files dated 2026-10-04 and 2026-10-05).

  • For each file, for each - [ ] line: find its commit (git log --oneline --fixed-strings --grep="<subject>" for "Commit …" steps; git log --oneline -- <path> for implementation steps naming a file; the step's tests by name in Tests/). Tick it.
  • A step with no evidence stays - [ ] and gets — did not ship: <one line> appended. Expected: 2026-10-04-editing-spike.md's VoiceOver step, 2026-10-04-viewer.md's and 2026-10-04-performance.md's "run the gates" steps (recorded on an M-series Mac only, per design.md); anything else found is reported in the commit message.
  • Commit "Tick the shipped plan steps" with the did-not-ship list in the body.

Task 2: docs/design.md

  • Replace the status paragraph (line 337) with one dated 2026-10-10: phases 1–7 built; the Mac released as v0.2.0 (notarized DMG, cask); iOS complete for Simulator builds, device signing and TestFlight not set up; owed: the M1 Air gate run, the VoiceOver check on both platforms.
  • Phase-1 boxes: leave lines 353 and 359 unticked; tick nothing else (all others are already [x]).
  • Open questions: tick "App name: Orgstar (chosen)" (line 390); add the lowercase spelling, per commit Name the app orgstar, in lowercase.
  • Under "Phases", after the list, one sentence: plans in docs/plans/ are ticked when their commits land, and what did not ship is marked in the plan; open work is in the repository's issues.
  • Commit "Design doc status for 2026-10-10".

Task 3: The review

  • At the top of docs/review-2026-10-05.md, under the title, a two-line note: every tier shipped between a831086 and 2d3da68 (git log --oneline a831086..2d3da68 | wc -l commits); the current list of refusals and gaps is docs/manual/guide/15-alongside-emacs.org, "Known differences from Emacs Org".
  • Check Sources/Orgstar/ClockViews.swift for the defects-table row "Clock report reads files from disk and ignores unsaved buffers"; if still true, it becomes an issue in Task 4.
  • Commit "Mark the October 5 review as historical".

Task 4: Issues for the open work

  • gitbay issue create --title … --file - for each, body: what, where, done-when, pointer to the plan when one exists:
    • Run the phase-1 gates on the M1 Air (ORGSTAR_GATES=1 swift test -c release --filter GateTests); record the numbers in design.md.
    • VoiceOver pass, Mac: the editing-spike checklist in docs/plans/2026-10-04-editing-spike.md.
    • VoiceOver pass, iOS: reader, editor, agenda rows, capture form.
    • Sparkle updates (docs/plans/2026-10-10-sparkle-updates.md).
    • Windows and panes (docs/plans/2026-10-10-windows-and-panes.md).
    • File splits (docs/plans/2026-10-10-file-splits.md).
    • iOS device signing and a TestFlight release script.
    • Clock report over unsaved buffers, if Task 3 found it still reads disk.
  • Issue 1 ("iOS: refile under a heading") stays as it is.
  • No commit; list the issue numbers in the merge request description.